top of page

TEAK DECKING

Each teak deck is entirely built in-house, minimizing on-site operations while ensuring direct quality control at every stage of the process.

PROCESS STAGES

  • On-board survey using 3D proliner or plywood templates

  • Final inspection prior to client delivery

  • Area study and measurement planning for planks and margins

  • CNC cutting of panels

  • Full teak deck construction with caulking in the selected color (black, grey, white)

  • Panel sanding and surface preparation with primer for bonding

  • Packaging and transport to the shipyard

  • On-board surface sanding and cleaning

  • Vacuum bonding installation

  • Sealing and final finishing

coperta11.jpeg
coperta12.jpeg

1. Survey  

two.jpg

2. Construction 

3. Vacuum Bonding 

4. Finishing 

coperta7.jpeg
coperta10.JPG
coperta9.jpg
bottom of page